Morogoro – Makutupora Railway

Project Type

Main Line

Country

Tanzania

Length

336

Stations

8

Category

New Line

Traction

2×25 kV AC OHL

Capacity

Project Start

2018

Stage

Under construction

Cost

US$ 1.924 B

Financing

Govt; Loan

Contract Type

Design-Build

Project Owner

Tanzania Railways Corporation (TRC)

Background

The Tanzania SGR project is a new railway network which is currently under construction to link Dar es Salaam on the east coast with Mwanza on the north west region. The project is intended to replace the old metre-gauge rail network on the Tanzania Central Railway Corridor with a total length of 2,707 km. This Corridor comprise the following sections: Dar es Salaam–Tabora (840km), Tabora–Kigoma (411km ), Tabora–Mwanza (379km), and Kaliua–Mpanda (km 210).

Phase I of the construction of the SGR starts from Dar es Salaam to Mwanza with route length of 1219 km. It will be implemented in five lots. The Morogoro – Makutupora railway is the second lot (Lot 2) of Phase I.

Read more...

Contractors

Main Contractor

Yapı Merkezi and Mota-Engil Africa

Sub-Contractors

COWI (Denmark) and Sener (Spain): Contracted by Yapı Merkezi to carry out the project detailed design.

ABB: Traction substations and auxiliary power supply.